The pass-through spars and the pressure bulkhead beneath the spar have been mounted in place. Next, the landing gear will be installed on the backside of the pressure bulkhead.
\r\n\r\n
Skip to contentThe pass-through spars and the pressure bulkhead beneath the spar have been mounted in place. Next, the landing gear will be installed on the backside of the pressure bulkhead.